Experience in "TITAN" System Implementation

2005-2006, AMS in Kahovka HPP

Engineering Ukrhydroproject
Working documentation SV-Telecom
Equipment Roctest, Geocon, BANСOMZVJAZOK
Construction BANСOMZVJAZOK, SV-Telecom
Commissioning BANСOMZVJAZOK
Project initiation 2005
AMS putting into operation 2006

HPP's  main characteristics: 

Commissioning year 1955
Established capacity 329 MW
Structures category I
Class run-of-river with spillway dike
Number of generating unit 6
Assumed pressure 13.8 m
Dam length 3.4 km

 

 

 

 

 

 





Total length of the dam - 4200 meters.

Level difference between forebay and tail water - 15 meters.

Kakhovka HPP

Monitored parameters:

  • Seepage back pressure force over the HPP’s bottom and spillway dam;
  • Relative movements of the power house building blocks, spillway dam and sections of the right and the left bank of the abutments;
  • Vertical deformations (settlements) of the HPP construction, spillway dam, abutments, ground adjoinings and dams;
  • Total seepage flow through the structures;
  • Pressure damping of water seals;
  • Seepage regime (depression curves) in the body of ground dams, adjoinings and  their foundations.
  • Concrete structure relative horizontal displacements.

AMS in Kahovka HPP